Crews completed demolition of the former Terminal C and completed site preparation work for the Phase II of Terminal 2. The basement level of Terminal 2 was excavated and underground utilities and other pipe work were set in place. The building’s foundations along with ground and basement level walls and floors were poured in anticipation of steel assembly in the Spring. |